Yari AlheriYari Alheri
Back · As Senator

Water · As Senator

Bakolori Dam repairs

Water gates at the Bakolori Dam. Photo: Aminu Dalhatu, Radio Nigeria.
Water gates at the Bakolori Dam. Photo: Aminu Dalhatu, Radio Nigeria.

80,000+members to benefit, says their chairman

Bakolori farmers wrote to Senator Yari in October 2026. He answered with repair work: water gates, blocked drains and support for dry-season farming.

An excavator clearing a drain at Bakolori. From an AIT News report.
An excavator clearing a drain at Bakolori. From an AIT News report.
Farmers beside the Bakolori scheme. From an AIT News report.
Farmers beside the Bakolori scheme. From an AIT News report.
A water control gate on the canal. From an AIT News report.
A water control gate on the canal. From an AIT News report.

Year by year

  1. Also plannedFertilizer and farm machinery for water users' associations, and checks on the Anka, Bukkuyum and NATO dams. 2
  2. October 2026Repair work on site: fixing one water gate, servicing another and clearing 20 to 30 drains. 1,3
  3. 4 October 2026The water users' association wrote to Senator Yari asking for help. 1

Senator Yari has promised to take a lasting fix for the silt in the dam to the Federal Ministry of Water Resources.

Sources (3)
  1. Daily Trust 2026-11-05
  2. Nigerian Tribune 2026-11-06
  3. Radio Nigeria 2026-10-31

News report

Related work

Try

Da wane harshe kuke so ku karanta?

Which language would you like to read in?

Kuna iya canzawa a sama a kowane lokaci. · You can switch at the top any time.